MS Project Integration with Integrity Lifecycle Manager: ability to synchronize Integrity Time entries with MS Project

Modified: 30-May-2017   


Applies To

  • PTC RV&S (formerly Integrity Lifecycle Manager) 2009 9.6 to 11.1

Description

  • Ability to resync IM Time entries between Integrity and MS Project
  • MS Project only contains/shows the work effor in total
  • No option to track the time spent on the project per resource in detail 
  • Synchronizing the tim entries from MKS Integrity into MS Project would offer such an ability.
  • Useful for project planning activities since it will show whether a project plan will be observed or needs to be rescheduled