Description

  • If a role has a principal and that role has the Required flag checked, then that role/principal is required.
  • If the role is unresolved and has the Required flag checked, the responsible role is assigned the activity.
  • The requirement is to not have any principal assigned to the activity if the role is unresolved.
  • Example:
    • If all of the roles are unresolved, then the activity should be completed.
    • However, if any of the roles have principals, then those roles (and only those roles) should be required to complete the activity before it is allowed to move on.
  • Is it possible to achieve functionality similar to the Create task for Responsible Role if unresolved role is ‘Required’ setting in Windchill versions prior to 11.1 M020?