Article - CS440526

How to change the B-B DRF (Datum Reference Frame) to B in GD&T Advisor

Modified: 18-Apr-2025   


Applies To

  • Creo Parametric 8.0 to 11.0

Description

  • How to change the B-B DRF (Datum Reference Frame) to in GD&T Advisor
This is a printer-friendly version of Article 440526 and may be out of date. For the latest version click CS440526