Article - CS440526
How to change the B-B DRF (Datum Reference Frame) to B in GD&T Advisor
Modified: 18-Apr-2025
Applies To
- Creo Parametric 8.0 to 11.0
Description
- How to change the B-B DRF (Datum Reference Frame) to B in GD&T Advisor
This is a printer-friendly version of Article 440526 and may be out of date. For the latest version click CS440526