Article - CS420742

Error ”500 500 The call failed on the server” pops up in BOM Transformer in Windchill MPMLink

Modified: 26-May-2025   


Applies To

  • Windchill Service Information Manager 13.0.0.0 to 13.0.0.5
  • Windchill MPMLink 13.0.0.0 to 13.1
  • Windchill PDMLink 13.0 to 13.1

Description

  • On BOM Transformer, when try to undo checkout on child part getting an error message.
  • 500 500 error message when trying to "Update to Current Upstream Equivalent Object" a downstream Access Node branch, from the upstream EBOM.
  • Error in BOM Transformer is displayed as below
500 500 The call failed on the server; see server log for details
  • Insert Made From in BOM Transformer with Preference Track “Made From” History Through Change Notice set to YES throws error 
    500 500 The call failed on the server; see server log for details
  • Allocate a part to an operation throws error message
500 500 The call failed on the server; see server log for details
  • For example, perform the following steps
    1. Create EBOM then create new downstream branch from BOM Transformer
    2. Open EBOM in BOM Transformer and right-click on top of ebom and Copy
    3. Right click on top at downstream and Paste as New Part
    • 500 500 error above is displayed

error1.jpg

    • In the earlier release, such as 12.1.2.0, the same operation gives following error
      • You are trying to copy a part with the same master and paste this part under the same master downstream. This will lead to circular links.
This is a printer-friendly version of Article 420742 and may be out of date. For the latest version click CS420742