Article - CS394530

In PLV mapping validation and data validation, After report generation all buttons gets disabled, so not able to close the PLV UI in Windchill Bulk Migrator

Modified: 12-Jun-2023   


Applies To

  • Windchill Bulk Migrator 12.1.2.0
  • Windchill 12.1.2.1 or 12.1.2.2 or 12.1.2.3 along with WBM 12.1.2.0
    • Issue does not occur when WBM 12.1.2.0 is used along with Windchill 12.1.2.0 

Description

  • In Pre-Load Validation (PLV) mapping validation and data validation, after report generation all buttons gets disabled and user cannot close the PLV
    • In PLV step, Upon execution of Mapping Validation or Data Validation, when user selects report icon to generate validation reports, After report generation all buttons gets disable, and it is not possible to click Update Status button or close the PLV UI
    • HTML and XML report files are getting generated, except PDF report
This is a printer-friendly version of Article 394530 and may be out of date. For the latest version click CS394530