Article - CS362931

Wrong status shown in CEDM session and the IKIT function sd-uwgm-inq-status

Modified: 23-May-2022   


Applies To

  • Creo Elements/Direct Modeling 20.3.3.0
  • Windchill Workgroup Manager

Description

  • The issue is independent of the version of WC as It resides in Modeling itself.
  • Checking-in a model with a secondary content and opening the model in Modeling It shows the right status "Checked-in" but, once removing the attachment the status in Modeling is wrong; it displays the old status "Changes have been uploaded and Checked".
This is a printer-friendly version of Article 362931 and may be out of date. For the latest version click CS362931