Default values given for the date variables in workflow are stored in the different format in Windchill PDMLink
Modified: 16-Mar-2018
Applies To
- Windchill PDMLink 11.1 F000 to F000-CPS01
Description
- Default values given for the date variables in workflow are stored in the different format
Steps to re-produce:
1. Create a workflow
2. Add 1 activity
3. Create 1 date variable with default value as 11/11/1987
4. Click on OK
5. Close the activity window
6. Again create a date variable
7. Give the default value as 1987-11-10
8. Click on OK
2. Add 1 activity
3. Create 1 date variable with default value as 11/11/1987
4. Click on OK
5. Close the activity window
6. Again create a date variable
7. Give the default value as 1987-11-10
8. Click on OK
Actual Result : The values are getting stored in different format
Expected Result : It should be stored in same format