Article - CS242561
How to allocate some specific "Occurrences" of a BOM to an "Operation" in Windchill MPMLink
Modified: 26-Mar-2026
Applies To
- Windchill MPMLink 10.2 to 13.1
Description
- How to allocate some specific Occurrences of a BOM to an Operation
- How to allocate different occurrences of a same usage to different Operations
- How to use 3D visualization to allocate specific occurrence
- While allocating parts to operations, is it possible to allocate some quantity of the usagelinks to one operation and some to other operations without splitting usagelinks
This is a printer-friendly version of Article 242561 and may be out of date. For the latest version click CS242561