Article - CS227786
Swapping workspace in PTC Requirements Connector (Former WRC)
Modified: 09-Dec-2024
Applies To
- PTC Requirements Connector (formerly Integrity Requirements Connector) 2.4 to 5.0
- Atego Requirements Synchronizer (ARS)
Description
- How can the default workspace path be swapped
- Change of default workspace during startup possible?
- Is a workspace switch also possible with the GUI?
- Projects missing from workspace after upgrading to a newer version of PTC Requirements Connector
This is a printer-friendly version of Article 227786 and may be out of date. For the latest version click CS227786