Engineer Costs Out Before They Get Built In

Up to 80% of a product’s cost is locked in before production. Protect your bottom line before it’s too late.

Overview Challenges Solutions Products Outcomes Case Studies
Contact Us

Protect your margins by controlling costs upfront

Raw material prices are on the rise, tariffs are constantly changing, and your customers still expect better machines at the same price. Most manufacturers try to recover margin downstream by negotiating with suppliers on price, but at that point most of the cost is already set. 70–80% of a product’s cost is set during engineering, before a single part is made. That’s where real savings start.

What’s driving up your product costs?

Cost overruns rarely come from one big mistake. Often, they are the results of hundreds of small decisions made in disconnected systems: redesigning a bracket that already exists, incorporating a part from an unapproved vendor, a late change that sends a design back through validation. Here’s where margin leaks for most equipment and machinery manufacturers.

Cost overruns rarely come from one big mistake. Often, they are the results of hundreds of small decisions made in disconnected systems: redesigning a bracket that already exists, incorporating a part from an unapproved vendor, a late change that sends a design back through validation. Here’s where margin leaks for most equipment and machinery manufacturers.

Reinventing the wheel

Engineers can spend close to a third of their time on non-value-added work like hunting for parts and recreating designs that already exist. Every duplicate part adds tooling, inventory, and quality costs.

Engineers can spend close to a third of their time on non-value-added work like hunting for parts and recreating designs that already exist. Every duplicate part adds tooling, inventory, and quality costs.

Part and SKU proliferation

One-off parts and endless variants bloat your part count. Each new part needs to be sourced, stored, inspected, and maintained. By designing multiple iterations of similar parts, you lose the volume pricing that standardization could provide.

One-off parts and endless variants bloat your part count. Each new part needs to be sourced, stored, inspected, and maintained. By designing multiple iterations of similar parts, you lose the volume pricing that standardization could provide.

Procurement brought in too late

When parts and vendors are picked without sourcing input, cost and supply risk get built into the design. One single-source specialty part can hold an entire production line hostage.

When parts and vendors are picked without sourcing input, cost and supply risk get built into the design. One single-source specialty part can hold an entire production line hostage.

The ripple effect of late changes

A problem found late triggers a full redesign loop: design change, revalidation, process review, and re-contracting suppliers. Each loop burns time, budget, and customer trust.

A problem found late triggers a full redesign loop: design change, revalidation, process review, and re-contracting suppliers. Each loop burns time, budget, and customer trust.

Margins are won long before manufacturing starts

The manufacturers protecting their margins aren’t just negotiating harder. They standardize parts, govern sourcing, and check cost while designs can still change, using one connected thread of product data from engineering to the supply chain.

PTC solutions have cost awareness built-in


PTC’s Intelligent Product Lifecycle creates a connected product data foundation that helps make cost-effective decisions before designs are locked in.

Windchill keeps engineers on approved parts and preferred vendors right inside the design environment and uses AI to flag duplicates before they’re created. Creo lets engineers simulate, check tolerances, and validate manufacturability before a prototype is built. Codebeamer and Pure Variants manage variability and reuse across hardware and software product lines. PTC Jetstream gives internal teams and suppliers a secure place to review designs and decide together, without needing access to CAD or PLM.

The result? Fewer parts, fewer surprises, and costs you can plan around.

The PTC solutions behind lower product costs

Achieving cost reduction isn’t done in one tool. It’s a connected set of capabilities that keeps product data, parts, suppliers, and decisions in sync from the first sketch to the shop floor.

Govern parts and suppliers with Windchill PLM

<p>Enforce approved part and vendor lists, find duplicates with AI, and connect eBOMs to mBOMs so cost decisions hold all the way to production. </p>

Design for cost and manufacturability with Creo

<p>Simulate early, loosen tolerances safely with tolerance analysis, and consolidate parts with additive design before you build a prototype. </p>

Manage variability and reuse with Codebeamer

<p>Connect requirements, risks, tests, and changes, so teams see the downstream impact of a supplier or material switch before it’s made. </p>

Collaborate with suppliers in PTC Jetstream

<p>Give suppliers and internal teams secure rooms to review 2D and 3D data, comment in context, and make decisions without CAD or PLM access. </p>

Govern parts and suppliers with Windchill PLM Enforce approved part and vendor lists, find duplicates with AI, and connect eBOMs to mBOMs so cost decisions hold all the way to production. Design for cost and manufacturability with Creo Simulate early, loosen tolerances safely with tolerance analysis, and consolidate parts with additive design before you build a prototype. Manage variability and reuse with Codebeamer Connect requirements, risks, tests, and changes, so teams see the downstream impact of a supplier or material switch before it’s made. Collaborate with suppliers in PTC Jetstream Give suppliers and internal teams secure rooms to review 2D and 3D data, comment in context, and make decisions without CAD or PLM access.

Up to 80% of lifecycle costs are locked in at the design stage

Most manufacturers focus on reducing costs after they're already built into the product. A select few do it differently, aligning engineering, sourcing, and manufacturing from day one to prevent unnecessary costs from entering the business.

Meet PTC at upcoming industrial events

Join PTC experts at events built for industrial manufacturers and see how leading equipment makers are taking cost guesswork out of engineering.

Girbau cut complexity management effort in half

With modular, rules-driven product structures in Creo and Windchill, Girbau halved the effort of managing hundreds of variants, saved 20% of R&D time, and used 13% less raw material on its new washer range.

What changes when cost control moves upstream?

When engineering, procurement, and manufacturing work from the same product data, savings don’t stop at one project. They compound across every product line, every variant, and every order.

When engineering, procurement, and manufacturing work from the same product data, savings don’t stop at one project. They compound across every product line, every variant, and every order.

Turn reuse into savings

Engineers find and reuse approved parts instead of creating new ones. Part counts flatten, and every reused part builds volume that lowers unit cost.

Engineers find and reuse approved parts instead of creating new ones. Part counts flatten, and every reused part builds volume that lowers unit cost.

Fewer, better suppliers

Approved manufacturer and vendor lists live inside the design tools, keeping engineers on vetted, preferred suppliers and giving procurement real buying leverage.

Approved manufacturer and vendor lists live inside the design tools, keeping engineers on vetted, preferred suppliers and giving procurement real buying leverage.

Leaner inventory, healthier margins

Consolidating duplicate parts and standardizing materials frees cash tied up in safety stock. Restricting component families typically saves 15–30% in inventory management costs.

Consolidating duplicate parts and standardizing materials frees cash tied up in safety stock. Restricting component families typically saves 15–30% in inventory management costs.

Fewer surprises on the shop floor

Connected engineering and manufacturing BOMs, model-based definition, and tolerance analysis help the factory build what engineering intended, with less scrap and fewer changeovers.

Connected engineering and manufacturing BOMs, model-based definition, and tolerance analysis help the factory build what engineering intended, with less scrap and fewer changeovers.

Profitable product configurations

Rule-based options and variants mean sales only quotes pre-validated configurations, so custom orders don’t quietly eat the margin between quote and delivery.

Rule-based options and variants mean sales only quotes pre-validated configurations, so custom orders don’t quietly eat the margin between quote and delivery.

Industrial manufacturers taking cost out with PTC

From earthmoving equipment to electric motors, see how industrial companies are reusing more, reworking less, and building a product data foundation that scales.

Liebherr Earthmoving unifies product development

By breaking down silos and unifying data, Liebherr Earthmoving improves traceability, reduces rework, and builds a scalable digital foundation for smarter, more sustainable machines.

/en/case-studies/liebherr-earthmoving-product-development-transformation

Landian increases design reuse by 30%

One of China’s largest motor makers standardized on Windchill and Creo, lifting delivery accuracy above 98%.

/en/case-studies/landian-improves-lead-time-efficiency-with-windhcill-creo

LS Industrial Systems boosts productivity by 20%

Breaking down data silos with Windchill and Creo increased design reuse, simplified assembly, and reduced costs.

/en/case-studies/ls-industrial-systems

Engineering for a Net-Zero Future

How Everllence dramatically accelerated production and reduced costs to meet the demands of large‑scale, mission‑critical manufacturing.

/en/case-studies/everllence-high-speed-milling-creo

Ready to stop designing unnecessary costs into your products?

Please wait while your request is being submitted...

Hi {name}, welcome back.
Not you?

  • Country
  • Afghanistan
  • Albania
  • Algeria
  • American Samoa
  • Andorra
  • Angola
  • Anguilla
  • Antarctica
  • Antigua and Barbuda
  • Argentina
  • Armenia
  • Aruba
  • Australia
  • Austria
  • Azerbaijan
  • Bahamas
  • Bahrain
  • Bangladesh
  • Barbados
  • Belarus
  • Belgium
  • Belize
  • Benin
  • Bermuda
  • Bhutan
  • Bolivia
  • Bosnia and Herzegovina
  • Botswana
  • Bouvet Island
  • Brazil
  • British Indian Ocean Territory
  • Brunei Darussalam
  • Bulgaria
  • Burkina Faso
  • Burundi
  • Cambodia
  • Cameroon
  • Canada
  • Cape Verde
  • Catalonia
  • Cayman Islands
  • Central African Republic
  • Chad
  • Chile
  • China
  • Christmas Island
  • Cocos (Keeling) Islands
  • Colombia
  • Comoros
  • Congo
  • Congo, Democratic Republic
  • Cook Islands
  • Costa Rica
  • Cote d ivoire
  • Croatia
  • Cuba
  • Cyprus
  • Czech Republic
  • Denmark
  • Djibouti
  • Dominica
  • Dominican Republic
  • East Timor
  • Ecuador
  • Egypt
  • El Salvador
  • Equatorial Guinea
  • Eritrea
  • Estonia
  • Ethiopia
  • Falkland Islands (Malvinas)
  • Faroe Islands
  • Fiji
  • Finland
  • France
  • French Guiana
  • French Polynesia
  • French Southern Territories
  • Gabon
  • Gambia
  • Georgia
  • Germany
  • Ghana
  • Gibraltar
  • Greece
  • Greenland
  • Grenada
  • Guadeloupe
  • Guam
  • Guatemala
  • Guinea
  • Guinea-Bissau
  • Guyana
  • Haiti
  • Heard & McDonald Isl
  • Honduras
  • Hong Kong
  • Hungary
  • Iceland
  • India
  • Indonesia
  • Iraq
  • Ireland
  • Israel
  • Italy
  • Jamaica
  • Japan
  • Jordan
  • Kazakhstan
  • Kenya
  • Kiribati
  • Korea, Republic of
  • Kuwait
  • Kyrgyzstan
  • Lao Peoples Dem. Rep.
  • Latvia
  • Lebanon
  • Lesotho
  • Liberia
  • Libyan Arab Jamahiriya
  • Liechtenstein
  • Lithuania
  • Luxembourg
  • Macau
  • Macedonia
  • Madagascar
  • Malawi
  • Malaysia
  • Maldives
  • Mali
  • Malta
  • Marshall Islands
  • Martinique
  • Mauritania
  • Mauritius
  • Mayotte
  • Mexico
  • Micronesia
  • Moldova, Republic of
  • Monaco
  • Mongolia
  • Montenegro
  • Montserrat
  • Morocco
  • Mozambique
  • Myanmar
  • Namibia
  • Nauru
  • Nepal
  • Netherlands
  • Netherlands Antilles
  • New Caledonia
  • New Zealand
  • Nicaragua
  • Niger
  • Nigeria
  • Niue
  • Norfolk Island
  • Northern Mariana Islands
  • Norway
  • Oman
  • Pakistan
  • Palau
  • Panama
  • Papua New Guinea
  • Paraguay
  • Peru
  • Philippines
  • Pitcairn
  • Poland
  • Portugal
  • Puerto Rico
  • Qatar
  • Reunion
  • Romania
  • Russian Federation
  • Rwanda
  • S.Georgia and S.Sandwich Isles
  • Saint Helena
  • Saint Kitts and Nevis
  • Saint Lucia
  • Saint Pierre and Miquelon
  • Samoa
  • San Marino
  • Sao Tome and Principe
  • Saudi Arabia
  • Senegal
  • Serbia
  • Seychelles
  • Sierra Leone
  • Singapore
  • Slovakia
  • Slovenia
  • Solomon Islands
  • Somalia
  • South Africa
  • Spain
  • Sri Lanka
  • St. Vincent and Grenadines
  • Sudan
  • Svalbard and Jan Mayen Islands
  • Swaziland
  • Sweden
  • Switzerland
  • Taiwan
  • Tajikistan
  • Tanzania United Republic of
  • Thailand
  • Togo
  • Tokelau
  • Tonga
  • Trinidad and Tobago
  • Tunisia
  • Turkey
  • Turkmenistan
  • Turks and Caicos Islands
  • Tuvalu
  • Uganda
  • Ukraine
  • United Arab Emirates
  • United Kingdom
  • Uruguay
  • US Minor Outlying Islands
  • USA
  • Uzbekistan
  • Vanuatu
  • Vatican City State (Holy See)
  • Venezuela
  • Vietnam
  • Virgin Islands (British)
  • Virgin Islands (U.S.)
  • Wallis and Futuna Islands
  • Western Sahara
  • Yemen
  • Zambia
  • Zimbabwe

Click the button below to continue.

Start Saving Today