Soluzione # - CS261972

Integrity 11.0 Hotfix HF-S160000000-017 Bulk Data Cache (BDC) file locked by Integrity when file is re-added to BDC

Modifica: 16-May-2017   


Si applica a

  • PTC RV&S (formerly Integrity Lifecycle Manager) 11.0

Descrizione

  • Integrity Bulk Data Cache (BDC) file gets locked by Integrity when file is re-added to BDC
  • Old file in file system cannot be renamed/removed because it is locked by Integrity Server java process and bulk data cache
  • Following error message appears in this situation. For example with synchronize sandbox operation:
MKS125414: The check out operation could not be completed because the revision cache was unable to rename the new file extracted from the archive
This is a PDF version of Article 261972 and may be out of date. For the latest version CS261972