Article - CS6687

Revising part to which process plan is associated, does not preserve the association between latest revision of part and process plan in Windchill PDMLink

Modified: 06-Aug-2021   


Applies To

  • Windchill MPMLink 10.0 to 11.2
  • Windchill PDMLink 10.0 to 11.2

Description

  • Revising part to which process plan is associated, does not preserve the association between latest revision of part and process plan 
  • After revise (do revision, change process) the process plan disconnect with its associated part.
  • The new version part lost the connection with MPMLink process plan.
  • If the process plan has been revised together with the part (it's collected by default), the new revision of the plan is associated with the old revision of the part.